Product Lead Time

PRODUCT FAMILYPRODUCTTYPICAL LEAD TIMENOTES
DualVee Wheels, Original Guide Wheels 1 day Orders received after noon PST will ship the following business day.
Large orders may require additional lead time.
  Wheels, Studded, SWS Series 1-2 days Orders received after noon PST will ship the following business day. 
Large orders may require additional lead time.
  Wheels, Studded, SWA Series 1-2 days Orders received after noon PST will ship the following business day. 
Large orders may require additional lead time.
  Wheels, Custom 24-30 weeks
  Bushings 1 day Orders received after noon PST will ship the following business day. 
Large orders may require additional lead time.
  Journals 1-2 days
  Lubricators 1-2 days
  Wheel Covers 1-2 days
  Wrenches 1 day Orders received after noon PST will ship the following business day. 
Large orders may require additional lead time.
  Track, Carbon, Hard, Drilled 2 days - 2 weeks Many std. catalog products can ship the following business day. 
Large orders may require additional lead time.
  Track, Carbon, Soft, Drilled 2 days - 2 weeks Many std. catalog products can ship the following business day. 
Large orders may require additional lead time.
  Track, Stainless, Hard, Drilled 2 days - 2 weeks Many std. catalog products can ship the following business day. 
Large orders may require additional lead time.
  Track, Stainless, Soft, Drilled 2 days - 2 weeks Many std. catalog products can ship the following business day. 
Large orders may require additional lead time.
  Track, Carbon, Hard, Undrilled 1-3 days Orders >100 pcs and pieces longer than 6ft. may require additional lead time.
  Track, Carbon, Soft, Undrilled 1-3 days Orders >100 pcs and pieces longer than 6ft. may require additional lead time.
  Track, Stainless, Hard, Undrilled 1-3 days Orders >100 pcs and pieces longer than 6ft. may require additional lead time.
  Track, Stainless, Soft, Undrilled 1-3 days Orders >100 pcs and pieces longer than 6ft. may require additional lead time.
  Track, Custom (cut sheet) 1-3 days Orders >100 pcs and pieces longer than 6ft. may require additional lead time.
 
Hepco Ring and Track Systems 4-6 weeks
  Bearings Check with Planner;
2 weeks for most
  Rails 3-4 weeks
  DLS 3-4 weeks
  PDU2 3-4 weeks
Other Check with Planner
 
LoPro LoPro Quick Ship (QS) ≤1 week

LoPro Quick Ship Qualifiers:

  • Undriven and Belt driven actuators only 
  • All sizes (1, 2S, 2L, 3, & 4)
  • Unmounted or Aluminum beam mounted only
    (Size 4 mounted excluded as steel beam is the only mounting option) 
  • System travel < 2.4 m
  • Excludes systems with motors, motor mounts, or gearheads
Belt Driven 1-3 weeks
  Chain Driven 2-3 weeks
  Lead Screw Driven 3-5 weeks
  Ball Screw Driven 6-8 weeks Lead times may be longer for certain ball screw sizes / pitches.
  Motor Mounts 2-3 weeks
  Wheel Plate 2-3 days
  Track Plate 2-3 days
  Other Sub-assemblies 2-3 days
 
MadeWell Radial Wheels 1 day Orders received after noon PST will ship the following business day. 
Large orders may require additional lead time.
  Crown Rollers 1 day Orders received after noon PST will ship the following business day. 
Large orders may require additional lead time.
 
MinVee Track, Carbon, Hard, Drilled 2 days - 1 week Larger orders may require additional lead time.
  Track, Carbon, Soft, Drilled 2 days - 1 week Larger orders may require additional lead time.
  Track, Carbon, Hard, Undrilled 2 days
  Track, Carbon, Soft, Undrilled 2 days
  Track Support, Drilled 3-5 days
Wheel Plate Assembly 1-2 days
 
QuickTrak QTD Double Edge System Assembly Check with Planner
  QTD Double Edge Track Assembly Check with Planner
  QTD Double Edge Wheel Mounting Kit Check with Planner
  QTD Double Edge Brake Kit Check with Planner
  QTD Double Edge Wheel Plate Check with Planner
  QTS Single Edge System Assembly Check with Planner
  QTS Single Edge Track Assembly Check with Planner
  Single Edge Wheel Mounting Kit Check with Planner
  QTS Single Edge Brake Kit Check with Planner
  QTS Single Edge Wheel Plate Check with Planner
  Wheel Plate Extrusion (Cut to length) 2-3 days
 
Signature Motion ECO60 - Std. lengths ≤1 week Travel lengths: 6", 12", 18" & 24"
ECO60 1-3 weeks
  Slick Stick - Std. lengths ≤ 1 week Travel lengths: 6", 12", 24", & 36"
  SlickStick 1-3 weeks
  SteadyRail (Driven) 4-6 weeks
  SteadyRail (Undriven) 1-2 weeks
  XLA15 / XLA9 5-7 weeks
 
Utilitrak Wheel Plate Assembly, PW Series 2-3 days
  Wheel Plate Assembly, SW Series 2-3 days
  Wheel Plate Assembly, CR Series 2-3 days
  Wheel Plate Brake Kit 2-3 days
  Track, PW Series, Aluminum 2-3 days Larger orders may require additional lead time.
  Track, SW Series, Steel 2-4 days Larger orders may require additional lead time.
UTTS1 currently 10 weeks.
Black oxide options available Q1 2019; lead time TBD
  Track, CR Series, Corrosion Resistant 4-5 days Larger orders may require additional lead time.


NOTES:

  1. Lead times are accurate when parts are available and/or in stock.
  2. Additional or special processes such as anodizing/plating/painting can add an additional 1-3 weeks to the lead time.
  3. Lead times do not include shipping time, FOB Pittsburg, CA.
  4. HEPCO Products: If the lead-time falls during the last week in December, add two additional weeks due to the international holidays.
  5. Expedites are possible. Call (888) 580-8272 for details.