Delivery Schedule
| PRODUCT FAMILY | PRODUCT | TYPICAL LEAD TIME | NOTES |
|---|---|---|---|
| DualVee | Wheels, Original Guide Wheels | 1 day | Orders received after noon PST will ship the following business day. Large orders may require additional lead time. |
| Wheels, Studded, SWS Series | 2-5 Days | Orders received after noon PST will ship the following business day. Large orders may require additional lead time. | |
| Wheels, Studded, SWA Series | 2-5 Days | Orders received after noon PST will ship the following business day. Large orders may require additional lead time. | |
| Wheels, Custom | Please Contact | Contact 925.439.8272 or info@bwc.com for details. | |
| Bushings | 1 Day to 3 Weeks | Most items will ship the following business day.
Large orders may require additional lead time. Contact 925.439.8272 or info@bwc.com for details. |
|
| Journals | 1-2 Days | Large orders may require additional lead time. | |
| Lubricators | 1-2 Days | ||
| Wheel Covers | 1-2 Days | ||
| Wrenches | 1 day | Orders received after noon PST will ship the following business day. Large orders may require additional lead time. |
|
| Standard/Catalog Drilled Track | 3 Days to 2 Weeks | Many catalog products can ship the following business day. Large orders may require additional lead time. | |
| Custom Drilled Track | 4 Days to 2 Weeks | Large orders may require additional lead time. | |
| Cut (Undrilled) Track | 3 Days to 1.5 Weeks | Many std. catalog products can ship the following business day. Large orders may require additional lead time. |
|
| Hepco | Ring and Track Systems | 4-8 Weeks | |
| Bearings | 4-9 Weeks | Specific bearings: 12+ Weeks. Contact 925.439.8272 or info@bwc.com for details. |
|
| Slides (straight track) | 6-10 Weeks | Orders >12 m (total length) may require additional lead time. | |
| DLS | 6-10 Weeks | Orders >4 pcs and pieces longer than 16 m may require additional lead time. | |
| PDU2 | 4-6 Weeks | Orders >3 pcs and pieces longer than 12 m may require additional lead time. | |
| Other | 6-8 Weeks | Contact 925.439.8272 or info@bwc.com for details. | |
| LoPro | LoPro Quick Ship (QS) | ≤1 week |
LoPro Quick Ship Qualifiers:
Contact 925.439.8272 or info@bwc.com for details. |
| Belt Driven | 1-4.5 Weeks | Contact 925.439.8272 or info@bwc.com for details. | |
| Chain Driven | 1-6 Weeks | Contact 925.439.8272 or info@bwc.com for details. | |
| Lead Screw Driven | 10 - 18+ Weeks | Contact 925.439.8272 or info@bwc.com for details. | |
| Ball Screw Driven | 6 -12+ Weeks | Contact 925.439.8272 or info@bwc.com for details. | |
| Gantry Kit | ≤1 week | Latest Gen. Gantry Brackets in stock Contact 925.439.8272 or info@bwc.com for details. |
|
| Motor Mounts | 4-6 Weeks | ||
| Wheel Plate | 3-5 Days | ||
| Track Plate | 3 - 10 Days | ||
| Other Sub-assemblies | 3-5 Days | ||
| MadeWell | Radial Wheels | 1 day | Orders received after noon PST will ship the following business day. Large orders may require additional lead time. |
| Crown Rollers | 1 day | Orders received after noon PST will ship the following business day. Large orders may require additional lead time. |
|
| MinVee | Track, Drilled | 1 - 2 Weeks | Some Catalog parts may ship following business day. |
| Track, Cut (Undrilled) | 3 Days –1.5 Weeks | Larger orders may require additional lead time. | |
| Track Support, Drilled | 3-5 Days | ||
| Wheel Plate Assembly | 3-5 Days | ||
| QuickTrak | All QTS/QTD Items | Please Contact | Contact 925.439.8272 or info@bwc.com for details. |
| Signature Motion | ECO60 | 3 - 4 Weeks | Standard Catalog Travel lengths (6", 12", 18" & 24") may ship sooner. |
| Slick Stick - Std. lengths | 3 - 4 Weeks | Standard Catalog Travel lengths (6", 12", 24" & 36") may ship sooner. |
|
| SteadyRail | 3-6 Weeks | ||
| XLA15 / XLA9 | 6-8 Weeks | ||
| Utilitrak | Wheel Plate Assembly, PW Series | 1-2 Weeks | |
| Wheel Plate Assembly, SW Series | 1-2 Weeks | ||
| Wheel Plate Assembly, CR Series | 1-2 Weeks | ||
| Wheel Plate Assembly, VC Series | 1 Week | Contact 925.439.8272 or info@bwc.com for details. | |
| Wheel Plate Brake Kit | 2-3 Days | ||
| Track, PW Series, Aluminum | 2-3 Days | ||
| Track, SW Series, Steel | 3 Days to 1.5 Weeks | Some profiles are out of stock. Larger orders will require additional lead time. Contact 925.439.8272 or info@bwc.com for details. |
|
| Track, CR Series, Corrosion Resistant | 5 Days - 2 Weeks | ||
NOTES:
Lead times are accurate when parts are available and/or in stock.
Additional or special processes such as anodizing/plating/painting can add an additional 1-3 Weeks to the lead time.
Lead times do not include shipping time, FOB Pittsburg, CA.
HEPCO Products: If the lead-time falls during the last week in December, add two additional Weeks due to the international holiDays.
Expedites are possible. Call 925.439.8272 for details.
As we approach the holiday season, we want to help you plan ahead and ensure your orders arrive in time to keep your applications and systems on schedule.
If you need products delivered before year-end, please review our holiday shipment schedule for the last dates to place your orders to ensure delivery in 2026.
Note of the following Bishop-Wisecarver closures:
- Thanksgiving: Thursday, November 26 – Friday, November 27, 2026 (we will return on Monday, November 30, 2026).
- Christmas Eve - New Year's Day: Thursday, December 24 – Friday, January 1, 2027 (we will return on Monday, January 4, 2027).
We encourage you to plan your orders accordingly to avoid any potential delays during the holiday season.
Last Order Dates for 2026 Delivery
| Product Family | Product | Order-By Date |
|---|---|---|
| DualVee® | Wheels, Original Guide Wheels | 12/11/2026 |
| Wheels, Studded Assemblies | 12/11/2026 | |
| Bushings | 12/11/2026 | |
| Journals | 12/12/2025 | |
| Lubricators | 12/11/2026 | |
| Wheel Covers | 12/11/2026 | |
| Wrenches | 12/11/2026 | |
| Track, Drilled, > 6 Ft. | 12/9/2026 | |
| Track, Drilled, ≤ 6 Ft. | 12/9/2026 | |
| Track, Cut to length, > 6 Ft. | 12/9/2026 | |
| Track, Cut to length, ≤ 6 Ft. | 12/9/2026 | |
| HepcoMotion® | Ring and Track Systems | Inquire |
| Journals | 11/16/2026 | |
| Rails/Slides (GV3, SL2, HDS2) | 11/9/2026 | |
| DLS | 11/9/2026 | |
| GFX | Inquire | |
| PDU2 | 11/23/2026 | |
| LoPro® | Belt Driven | 11/12/2026 |
| Chain Driven | 11/12/2026 | |
| Lead Screw Driven | Inquire | |
| Ball Screw Driven | Inquire | |
| Motor Mounts | Inquire | |
| Wheel Plate | 12/4/2026 | |
| Track Plate | 12/4/2026 | |
| Other Sub-assemblies | 12/4/2026 | |
| MadeWell® | Radial Wheels | 12/11/2026 |
| Crown Rollers | 12/11/2026 | |
| MinVee® | Track, Drilled | 12/4/2026 |
| Track, Cut to length | 12/9/2026 | |
| Track Support, Drilled | 12/9/2026 | |
| Wheel Plate Assembly | 12/9/2026 | |
| Wheel Plate Extrusion (Cut to length) | Inquire | |
| Signature Motion | SlickStick™* | Inquire |
| ECO60™* | Inquire | |
| SteadyRail (Undriven) | Inquire | |
| SteadyRail (Driven) | Inquire | |
| XLA15 / XLA9 | Inquire | |
| UtiliTrak® | Wheel Plate Assembly | 12/9/2026 |
| Wheel Plate Brake Kit | 12/9/2026 | |
| Track, PW Series, Aluminum | 12/9/2026 | |
| Track, SW Series, Steel | 12/9/2026 | |
| Track, CR Series, Corrosion Resistant | 12/4/2026 |
LAST SCHEDULED SHIPPING DAY: Wednesday, December 23, 2026
Suggested Last Day to Place Orders
| Shipping Method | Order-by Date |
|---|---|
| Ground, 7-day transit | 12/10/2026 |
| Ground, 6-day transit | 12/14/2026 |
| Ground, 5-day transit | 12/15/2026 |
| Ground, 4-day transit | 12/16/2026 |
| Ground, 3-day transit | 12/17/2026 |
| Ground, 2-day transit | 12/17/2026 |
| 3-Day Air | 12/17/2026 |
| 2-Day Air | 12/17/2026 |
| Next-Day Air | 12/18/2026 |
Contact us as soon as possible at (925) 439-8272 to submit an order or to talk to one of our experts.
Order-by-date (above) is provided as a guideline for scheduling orders for shipment prior to the end of the shipping year. The time frame listed is not a guarantee and may vary by product or size.
